The failing road surface in Leah St is evident to most people who use it regularly. As the road needs to be reconstructed Council are currently consulting residents on what look and feel they want in the street
The key features of the proposed improvements include:
Kerb extensions to slow vehicle movement through each intersection, as well as improvement pedestrian safety and access crossing Leah Street and adjacent side streets
Kerb extensions to provide increased area for streetscape landscaping and increased tree planting
Distinctive coloured intersection pavement treatment
Retention of Leah Street road humps
Strengthen pedestrian connection between Wilberforce Walk, Unley Swimming Centre and Forestville Reserve across the neighbourhood.
No comments:
Post a Comment