The latest update was released on Fri. The news to be found at;(this is yet to be uploaded) describes the continuing 'early works' programme.
  • The culvert for the Brownhill Creek diversion. Night works for this will continue from 28th Dec to 31st Dec 2012, continuous construction activity will occur.
  • SA Power Networks trenching in Aroha Tce, Lyons Pde and Railway Tce South.
  • Overhead power lines installed in foster St.
  • Reconfiguration of the Victoria St pedestrian crossing.
  • Removal of the rail tracks (7am to 10pm) from the 9th Jan 2013
  • The continuation of the Cromer Pde sewer installation
  • Completion of the site storage at Wayville Showgrounds.
  • Demolition of houses in Devon St and Victoria St (at this stage 2)
  • Culvert installation from 9th Jan 2013
Please remember this project is a state government project, the information hot line number is 1300 443198 and email address dpti@sa.gov.au